Dock & SeawallGuide · SW Florida

Naples, Collier County

Dock & Seawall Contractors in Naples, FL (2026)

Before signing for shoreline work in Naples, give every bidder the same job to inspect. This page helps you build that request from dock, lift and seawall categories, then compare contractors through recorded permit activity. Keep the source of the figures in view and use the visits to establish the work at your own property.

2,540marine permits tracked in Cape Coral + Lee County
$45,000median dock + lift permit
$20,000median seawall permit
$16,600median boat lift permit

What the permits show

  • Naples permits are not in our records yet; the ranking uses Cape Coral + Lee County permits (1,483 for the contractors listed).
  • Honc Docks & Lifts pulled the most dock, lift and seawall permits (284), followed by WB Williamson Bros and Williamson and Sons Marine Construction.
  • Median permit values (Cape Coral + Lee County): dock with lift $45,000, seawall $20,000, boat lift $16,600.
  • Permits here go through City of Naples.

Marine contractors ranked by permits (Cape Coral + Lee County)

Naples permits have not been pulled for this ranking. It draws on Cape Coral and Lee County, the nearest records we track. Permit counts describe activity, not construction quality. Check the license and compare quotes.

1 Honc Docks & Lifts 284 130 59 69 26 302 $37,500 65%
2 WB Williamson Bros 281 94 75 93 19 294 $31,600 68%
3 Williamson and Sons Marine Construction 234 0 8 226 0 234 $16,000 71%
4 Stokes Marine 121 47 43 5 26 143 $40,000 66%
5 Rusnell Marine Construction 91 40 32 1 18 95 $29,400 71%
6 Crocker Marine Services 86 22 32 27 5 95 $42,800 34%
7 Hickcox Brothers Marine 60 30 24 0 6 75 $28,000 52%
8 Hawley Construction 58 28 15 0 15 64 $24,200 70%
9 Honc Marine Contracting 58 0 1 57 0 58 $33,500 66%
10 Aquamarine Construction 42 26 10 3 3 46 $31,000 80%
11 Hooker Marine Construction 39 23 5 3 8 39 $30,200 77%
12 Mauney Marine Construction 36 19 9 3 5 38 $25,000 61%

Source: City of Cape Coral and Lee County permit records, the nearest marine permit records we track. Collier County permits are not in this ranking yet. Ranked by dock, boat lift and seawall permits issued or filed Nov 2025 - Oct 2026; all marine permits also counts lift covers and other marine work. Median job = the median value declared on the contractor's dock, lift and seawall permits here. Finaled = share of all its permits that passed final inspection or closed. How we rank.

The 3 most active contractors

1

Honc Docks & Lifts

284 dock, lift and seawall permits in Cape Coral + Lee County

Job mix
dock + lift 130, seawalls 69, docks 59
Median job
$37,500
All permits tracked
302
Finaled
65%

Where it works most: Cape Coral (227), Lee County (57), Cypress Lake (8), North Fort Myers (7)

License CGC1535844 · Full profile

2

WB Williamson Bros

281 dock, lift and seawall permits in Cape Coral + Lee County

Job mix
dock + lift 94, seawalls 93, docks 75
Median job
$31,600
All permits tracked
294
Finaled
68%

Where it works most: Cape Coral (213), Lee County (48), Cypress Lake (12), North Fort Myers (9)

License CGC1512211 · Full profile

3

Williamson and Sons Marine Construction

234 dock, lift and seawall permits in Cape Coral + Lee County

Job mix
seawalls 226, docks 8
Median job
$16,000
All permits tracked
234
Finaled
71%

Where it works most: Cape Coral (219), Lee County (8), Cypress Lake (3), Iona (2)

Full profile

What docks, lifts and seawalls cost in Naples

A decking choice is easier to compare after you know what supports it. For your Naples dock, ask about pilings and removal before settling the surface material. Keep lift equipment and seawall work visible as their own parts of the proposed scope.

JobMedian permit valueMiddle half of jobsPermitsData from
Dock + boat lift$45,000$29,600 - $64,800618Cape Coral + Lee County
Dock$24,000$12,500 - $40,000493Cape Coral + Lee County
Seawall$20,000$14,000 - $33,000545Cape Coral + Lee County
Boat lift$16,600$8,360 - $25,200176Cape Coral + Lee County
Lift cover or canopy$2,490$2,280 - $6,280475Cape Coral + Lee County

Values are what contractors declared on public permits (job value at filing). They are local averages for information, not a quote: only a contractor who sees your shoreline can price your job.

Seawalls in Cape Coral and Lee County: a median of $240 per linear foot on 417 permits that state a length (middle half $184-$375); the typical wall was 80 feet.

  • Ask which existing pilings remain beneath the proposed new decking.
  • Separate lift capacity and motor choices from the deck material discussion.
  • Put seawall length, panel type and demolition into each wall proposal.
Keep reading

Have the contractor look under the deck before writing a proposal limited to the surface. If you request composite instead of pressure-treated wood, keep that material choice consistent across the bids. Then read what each says about supports, removal and equipment access. A description that simply says new dock leaves you without enough detail to compare the structures and work being offered for your Naples property.

The cost table draws its medians from values declared on Cape Coral and Lee County permits. For combined dock-and-lift work, that median is $45,000. It is neither an invoice nor a Naples-specific price. The table's separate rows help you distinguish a stand-alone lift from a project that includes new dock construction. Only a contractor who has seen your shoreline can price the scope at your home.

A seawall needs the same clarity about what stays and what is removed. Ask for the proposed length and concrete or vinyl panel choice to be written down, together with demolition and access. If the dock work includes a lift, have the capacity, motors, cables and canopy described. Read those details before comparing proposal amounts so differences in the work do not disappear behind a shared project label.

Permits for marine work in Naples

The City of Naples is the permit office named here for your project. Ask the hired contractor to confirm the city's requirements for the work and give you the permit number before construction. Keep the address lookup and final inspection check in your plan.

Permit office: City of Naples

Your contractor pulls the permit; you can look it up afterwards by address in the office's public permit search.

  • Ask the city how to find the permit using your property address.
  • Have the contractor pull the permit for the work it performs.
  • Discuss final inspection and the last payment before signing the agreement.
Keep reading

Your city permit process belongs with the City of Naples, even though the activity records on this page come from neighboring jurisdictions. Ask the office how to look up the property by address and keep the current permit number from the contractor. Compare the filed description with the written scope. Bring any question about the work shown in the record to the contractor before construction starts.

For a larger Florida project, discuss the Notice of Commencement along with the application. It is recorded with the county before work starts and posted at the job site. The hired contractor obtains the permit for its work. An owner-builder permit is for your own home and means taking on the contractor's responsibilities, so understand that role before agreeing to handle an application that way.

When construction is complete, return to the permit file. Final inspection is the last step to confirm before making the last payment. Have the contractor identify the recorded final and retain the permit number with your project documents. A completed walking surface or working lift is something you can see at the property; the permit's final is something to verify in the official record as well.

How to choose a marine contractor in Naples

Use the difference between a wall-heavy record and a dock-and-lift record to shape your Naples calls. Neither pattern determines workmanship. The useful comparison combines relevant activity, a separate license lookup, completion status and written proposals that describe the same job.

  • Read the project categories before choosing names from the overall order.
  • Check myfloridalicense.com for the contractor named in the proposed agreement.
  • Get 3 written quotes after defining a common material and demolition scope.
Keep reading

Williamson and Sons Marine Construction's displayed record includes 226 seawall permits. Honc Docks & Lifts has 130 dock-and-lift entries in its mix. Those counts answer different project questions, so use the relevant category rather than treating all activity as interchangeable. A contractor with many dock entries and a contractor with many wall entries still each need to inspect your property and explain the proposed work in writing.

Completion status adds context to those activity counts. Finaled describes a permit that passed final inspection in Cape Coral or closed with a certificate of completion in Lee County. Read the share together with the total tracked records. It is not a review score. For your hiring decision, also check Florida DBPR's license lookup and compare the stated scope, exclusions and payment steps in each agreement.

You can select up to 3 contractors in the quote form and they will contact you to look at the Naples job. Provide the same photos and request so each visit starts with the same information. Rankings are never paid. Once you hire, that contractor handles the written contract, sets the price, pulls the permit and performs the work. Confirm those terms in its proposal before signing.

Waterfront conditions in Naples

Naples is in Collier County. Keep that location attached to your project when reading activity drawn from elsewhere. At the visit, explain your water setting, how the dock is used and which sections of the wall or lift need attention.

  • Describe canal or other shoreline conditions directly from your own property.
  • Identify any salt exposure, barnacles or wakes observed around the structure.
  • Keep Golden Gate and Marco Island comparisons tied to their record sources.
Keep reading

There is no counted Naples ZIP selection on this page. Golden Gate, Bonita Springs and Marco Island are nearby town links, with Estero also listed for comparison. Look at their source labels before moving a number into your notes. A neighboring town page can help you read a contractor's recorded activity, while your City of Naples project needs its own site inspection and permit conversation.

Tell the person preparing the quote what water faces the lot and how wakes affect the structure when you observe them. Sun and saltwater wear exposed parts, and barnacles can be part of the condition around marine supports. Show the contractor any components you intend to retain. The proposal should connect those existing parts with the new decking, lift equipment or wall work you are requesting.

Older seawalls can lean, crack or lose fill behind the cap. Photograph those areas and point them out during the walk along the wall. Hurricanes have driven rebuilding throughout Southwest Florida, but the scope still starts with an assessment of your actual structure. Ask the written proposal to distinguish a repair from replacement and to explain the removal involved before deciding which offered work addresses the problems you have observed.

How we rank contractors

Permits, not ads

We count the marine permits each contractor pulled, from the city and county permit offices' public records.

Named on the record

The contractor named on the permit gets the credit. You can look up any permit by address yourself.

Never paid placement

Contractors can't buy a higher rank. Network partners get a call button; the order stays the data's.

Docks and seawalls in Naples: common questions

Which contractor has the largest count in the displayed table?

Honc Docks & Lifts has 302 permits in the displayed ranking area. The total measures recorded permit activity, while the job mix breaks out the types of work. For your Naples project, use the matching category to prepare questions, check the license and compare written proposals after visits.

Do the cost medians describe completed Naples invoices?

No. They summarize declared job values from the permit sample named in the cost table. Those amounts were filed with applications and are not invoices. Your dock size, supports, equipment and access still need a contractor's inspection before the proposed scope and its price can be established.

Should I call the City of Naples about my permit record?

Ask the City of Naples how to locate the permit for your property address. The hired contractor handles the permit for its work and should provide the number before construction. Use that number again to check the recorded final before the last payment on your project.

How do I compare a new wall with a repair proposal?

Have the wall inspected and ask what each proposal retains, removes and replaces. Include the panel material, affected length and access in that discussion. You need to see how the offered work addresses cracks, leaning or lost fill before deciding whether the proposals answer the same problem.

Where can I verify the contractor's Florida license?

Use Florida DBPR's lookup at myfloridalicense.com. Check the contractor named on the agreement you are reviewing. A position in the table measures permit volume and does not perform that license check for you. Keep the lookup separate from your comparison of job mix and written work descriptions.

What should I have ready for a Naples dock visit?

Bring photographs, the boat details if a lift is planned, and a description of the deck and supports you want inspected. Show the equipment access route and identify old material to be removed. Give each contractor the same request so its written quote addresses a comparable scope.

Get quotes from up to 3 marine contractors who work in Naples

Tell us about your waterfront and pick who you want to hear from. Our local marine contractors look at your dock, lift or seawall and price the job themselves. Free, no obligation.

Get up to 3 quotes
Get up to 3 quotes